Taralynn Ave Waterline Replacement - CIP 4120

Project Description:

 Replace 520 feet of 4-inch and 500 feet of 6-inch waterline with HDPE water pipe from Allen Blvd to end of cul-de-sac.


Project Status:

 12-30-14: Design by staff is 50% complete.

FY 15-16: Complete design.

FY16-17: Complete construction.

Substantial Completion Date:

 September 30, 2017
 
CIP 4120 Description
Worker using specialized tool to cut pipeline to spec.